WIP Limits for Lanes
It is possible to set WIP (work-in-progress) Limits for vertical and horizontal lanes, so that
you get a visual feedback when this limit is met or exceeded. To set WIP Limits for lanes, go to
view setup → Limits:
The example above shows the limit for In Progress set to 4. Now the exceeded WIP Limit is
explicitly seen on the view, which will alarm you and your team whenever the limit is exceeded by
pulling too much work into progress.