Installation planning
Before installing a link, consider the
following:
- Cable routing diagrams
- Location and length of each link
- Type, location, and identification of connectors, adapters, and couplers
- Locations of splices and distribution panels
- Manufacturer data sheets
- Cables
- Bend radius control
- Connectors
- Strain relief
- Splices
- Distribution panels
- Attached devices
- Warranty statement (for new installations)
- Link verification. Contact IBM® for more information.
The link must be compatible with the devices that attach to it. See Specifications for the cable specifications required to support FICON®-capable, or coupling facility channel-capable devices.
Other devices and applications can also attach to a trunk cable. Refer to the appropriate planning publications for specific device and cable requirements.