Whenever a load clear or system reset clear is performed on an LP, it forces the reserved
central storage element offline. This allows z/OS® and z/VM to
flag the reserved storage element as reconfigurable to allow it to be later deconfigured from the
LP. z/VM®The z/VM Dynamic Memory Downgrade,
introduced with APAR VM66271 to z/VM 7.2, provides the ability to deconfigure storage while
maintaining normal system operation. See the "Host Storage Planning and Administration" chapter in
z/VM CP Planning and Administration, SC24-6271.Note: When z/OS or z/VM is IPLed immediately after
the LP is activated, the reserved central storage element is offline.