Upgrade on Linux nodes
Use these tables to access documentation for IBM Storage Scale upgrade on Linux® nodes.
Upgrade task | Documentation |
---|---|
1 Go through the IBM Storage Scale product overview to understand the available features that include support for protocols. |
|
2 Review the planning considerations for IBM Storage Scale including protocols. |
|
3 Review the hardware requirements, software requirements, and specific prerequisites for protocols. |
For more information, see IBM Storage Scale FAQ in IBM® Documentation. Detailed information about supported Linux distributions and minimum kernel levels is also available in IBM Spectrum® Scale FAQ. |
Upgrade task | Documentation |
---|---|
1 Understand the available upgrade options and supported upgrade
paths, and choose one of the two upgrade options.
|
|
2 Review considerations for upgrade that include coexistence considerations and compatibility considerations. |
|
3 If you are using the installation toolkit for the upgrade, run the upgrade precheck procedure. Important: Run the upgrade precheck procedure when you are preparing for upgrade. You
can address any issues that are flagged during the precheck before the upgrade starts.
|
Upgrade task | Documentation |
---|---|
1 Upgrade core GPFS by using one of these procedures. |
|
2 Upgrade protocols. |
|
3 Upgrade performance monitoring. |
|
4 Upgrade management GUI. |
|
5 Upgrade call home. |
|
6 Upgrade file audit logging. |
|
7 Upgrade Cloud services. |
|
8 Complete the upgrade. |
|
Optional If required, you can also do an offline upgrade with complete cluster shutdown. |
|
Optional Revert to the previous level, if needed. |
|
Optional Change the product edition, if needed. |
Upgrade task | Documentation |
---|---|
1 Ensure that preparatory tasks for using the installation toolkit are complete. |
|
2 Review the considerations for doing upgrade with the installation toolkit. |
|
3 Run the upgrade precheck procedure and address any issues that are flagged. |
|
4 Run the upgrade procedure; online or offline. |
|
5 Complete the upgrade. |
|
Optional Rerun upgrade after an upgrade failure. |
|
Optional Upgrade IBM Storage Scale on IBM Storage Archive Enterprise Edition (EE) nodes. |