Installing the switch onto the shelf brackets

Use this information for general instructions about installing the switch onto the top of the shelf brackets.

About this task

For more information, see Required equipment.

The IBM® c-type SAN director shelf bracket kit can be used to support the switch in a non-threaded rack. This shelf bracket kit can be used as a permanent support. Use it when you install an IBM c-type SAN director in a rack that meets the requirements that are listed in Rack requirements.

Warning: This unit is intended for installation in restricted access areas. A restricted access area can be accessed only by using a special tool, lock and key, or other means of security.
Warning: Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Note: Before you install, operate, or service the system, see the IBM Systems Safety Notices for important safety information.

Procedure

To install the switch onto the top of the shelf brackets, complete the following steps.

  1. Verify that the shelf brackets are level and securely attached to the rack-mounting rails, the crossbar is securely attached to the shelf brackets, and the rack is stabilized.
  2. Slide the switch onto the shelf brackets, ensuring that it is squarely positioned.
  3. Attach the IBM c-type SAN director switch to the rack-mounting rails.
    1. Slide the clip nuts over the holes on the non-threaded rails on the rack. These clip nuts provide the threading for the screws that secure the chassis to the rack.
    2. Use the 12 10-32 x 1/2 inch screws provided in this shelf bracket kit to secure the chassis to the rack. See Required equipment.
    CAUTION:
    Ground the chassis, even if the rack is already grounded. A grounding pad with two threaded M4 holes on the chassis exists for attaching a grounding lug.