Testing Transformation Extender maps
You can test running an IBM Transformation Extender map on a Sterling B2B Integrator server.
About this task
When you run an IBM Transformation Extender map, the map run operation attaches the compiled map and input files to a request message and sends it to the Sterling B2B Integrator server. After processing has completed successfully, the Sterling B2B Integrator server returns a response message with the status of the map run, any error messages, and audit log file if available to the Design Studio.
To test running an IBM Transformation Extender map on a Sterling B2B Integrator server:
Procedure
Results
The map run operation completes. For more details about the run results from testing an IBM Transformation Extender map on a Sterling B2B Integrator server, see Result details from test running maps.
What to do next
When you have completed testing your maps so that they run without errors and are ready for production, there are additional tasks to complete. You can deploy the maps to the production environment using the Deploy map to Sterling B2B Integrator option in the context menu of the selected maps. For information about running maps in a production environment, see the IBM Sterling B2B Integrator documentation.