SPLIT Keyword (XGRAPH command)
The SPLIT
keyword specifies whether zvars
(the variable after the last BY
in the chart expression) is used to split the chart and create a
population pyramid. The keyword is followed by an equals sign (=)
and the value for that keyword.
Note:
The SPLIT
keyword is not the
same as the PANEL
subcommand.
The keyword splits the chart before it is paneled.
NO. Do not split the chart. This is the default.
YES. Split the chart and create a population pyramid.