Spatio-Temporal Prediction - Advanced Build Options
Users with detailed knowledge of STP can use the following options to fine-tune the model building process.
- Maximum percentage of missing values
- Specify the maximum percentage of records that contain missing values that can be included in the model.
- Significance level for hypotheses testing in model build
- Specify the significance level value to be used for all tests of STP model estimation, including two Goodness of Fit tests, Effect F-tests and Coefficient T-tests. This level can be any value from 0 to 1, changed in 0.01 increments.