Generating a New Model
- Close the Time Series model nugget and delete it from the canvas.
The old model was built on 60 rows of data. You need to generate a new model based on the updated sales data (63 rows).
- Attach the newly generated Time Series build node to the stream.
Figure 1. Attaching the modeling node to the stream - Open the Time Series node.
- On the Model Options tab, ensure that
Continue estimation using existing models is checked.
Figure 2. Reusing stored settings for the time series model - Ensure that Extend records into the future is set to 3.
- Click Run to place a new model nugget on the canvas and in the Models palette.