Start a backup job
You can start a backup job on demand outside of the schedule that is set by the SLA policy.
Procedure
To start a backup job on demand, complete the following steps:
What to do next
To view the job log, click the job in the Running Jobs tab.
The log screen shows the following details:
- Status: shows whether the message is an error, warning, or informational message.
- Time: shows the time stamp of the message.
- ID: shows the unique identifier for the message if applicable.
- Description: shows what the message is.
You can download a job log from the page by clicking Download .zip. If you want to cancel the job, click .