GRID - Host Group - Running Jobs

This simple graph shows the number of running jobs over time per host group, giving a good idea of how busy the host group is. Different jobs have different durations, so it is instructive to look at other graphs for the host group over the same period as done and exited jobs to show the actual rate of job completion. It is also important to consider that some jobs might be SMP or distributed parallel jobs that consume multiple job slots.

Figure 1. GRID - Host Group - Running Jobs