Viewing tasks for a specific resource

Use resource detail pages to view only the tasks for a specific monitored resource. Each resource detail page has a Tasks link that lists only the tasks for the associated storage system, server, hypervisor, switch, or fabric.

Procedure

  1. In the menu bar, select a type of top-level resource.
    For example, if you want to view the tasks for a storage system, go to Storage and select the type of storage system you want to monitor.
  2. Right-click a resource in the list and select View Details.
    The resource detail page is displayed. In the General section, the number next to Tasks represents the number of tasks that are associated with the resource. For example, Tasks (3) indicates that you can view three tasks.

    The icon next to the Tasks link represents the most critical status of the tasks that are associated with the resource. For example, if a task failed, the following icon is shown:

    Tasks (3) Error status

  3. Click Tasks in the General section to view the tasks for the resource.
    The information about tasks is organized into columns. These columns include information about the status of tasks, the most recent date and time when tasks ran, and the schedule for tasks.
  4. Optional: View the status icons on the Tasks pane to view a summary of task statuses.
    This summary includes the number of tasks that have a Failed, Warning, Successful, or Running status.
    Tip: To view descriptions of the icons and columns on the Tasks pane, click the Help icon Help icon.