Verify that a performance monitor is running for a resource
to ensure that IBM
Spectrum Control is
collecting performance metrics about the resource. Use performance
monitors to collect metrics about the performance of storage systems
and switches.
About this task
To verify that a performance monitor is running for a resource,
use the resource list page in the web-based GUI.
Procedure
-
From the menu bar, go to a resource list page for a resource type.
For example, to verify that a performance monitor is running for a storage system, go to and select the type of storage system you want to monitor.
- Locate the resource that you want to check.
- View the Performance Monitor Status column.
A value of Completed or Running indicates that the performance monitor
is collecting performance metrics about the resource. The Last Successful Monitor
column shows the most recent date and time when the performance monitor
successfully collected data.
- Optional: If the Performance Monitor Status
column shows a status of Running with problems, Completed with warnings,
Failed, or Canceled, you can view the logs to troubleshoot the error
or warning messages. To view the performance monitor logs, right-click
the resource row and click .
- Optional: If the Performance Monitor Status
column shows a status of Disabled, to enable the performance monitor
for the resource, right-click the resource row and click . On the Data Collection Schedule page, select Enabled.
Tip: You can set the performance monitor to Enabled only if the probe is set to Enabled. If a
probe is set to Disabled, the performance monitor
cannot run.