Viewing all performance monitors

To view all of the performance monitors that IBM Spectrum® Control uses to collect metrics for measuring the performance of storage systems and switches, use the Performance Monitors page.

The Performance Monitors page displays one row for each storage system or switch that IBM Spectrum Control is monitoring. If a performance monitor is not scheduled for a resource, the status column is set to Disabled for the performance monitor row.
Before IBM Spectrum Control can collect performance metrics for a resource, the resource must fulfill the following conditions:
  • A probe must be run for the resource.
  • For switches, the switch must be managed by a CIM agent.
  1. In the menu bar, go to Home > Performance Monitors.
    On the Performance Monitors tab, the information about performance monitors is organized into columns. These columns include the status of performance monitors, the names of the monitored resources, and the most recent dates and times when data was successfully collected.
  2. Optional: View the status icons at the top of the page to view a summary of performance monitor statuses.
    This summary includes the number of performance monitors that have a Running, Running with problems, Failed, or Not Running status.