Rerunning an exited flow array

You can rerun a flow array that has exited. You can rerun the entire flow array, or only those elements of the array that exited. When you rerun a flow array, the job array has a new ID.

About this task

Note:

Rerunning a job array that triggers an alarm will not reopen a previously opened alarm.

Procedure

  1. Select Workload > Workload.
  2. In the summary list, select the Exited flow that contains the flow array you want to rerun.
  3. Select the Flow Chart tab in the details pane.
  4. Select the flow array, right-click, and select Rerun.