Upgrading SevOne NPM to 7.2.x from Previous Versions
OVERVIEW
The IBM SevOne Network Performance Management (NPM) 7.2 contains the following components.
- SevOne NMS
- SevOne Data Insight
- SD-WAN
- SDN
- Wi-Fi
Note:
If you have any doubts, please reach out to SevOne Support or Expert Labs for guidance before initiating the upgrade.
- To upgrade to SevOne NMS 7.2.0, the minimum mandatory version you must be on is SevOne
NMS 7.0.1 or above. If you are on a version prior to SevOne NMS 7.0.1, please refer to Upgrading SevOne NPM to 7.0.x from Previous
Versions.
- To ensure the smoothest upgrade and not interrupt your user’s productivity, do not initiate your
upgrade until you have reviewed all deprecations for each release you pass through on your upgrade
path to 7.2. Deprecation notices are communicated in the IBM’s Release announcements. Please sign
into the IBM Support Portal and subscribe to IBM SevOne
NPM.
- To complete your upgrade, all components must be on the same version. IBM supports one
version back for the purpose of performing upgrades.
- Not all features will be enabled until components are on the same version.
- Some features will not work unless the components are on the same version.
- Order of Upgrades
When multiple components of SevOne NPM are involved, the Solutions components (SDN, SD-WAN, and Wi-Fi) must be upgraded first followed by SevOne Data Insight and then, SevOne NMS.
If you have any doubts, please reach out to SevOne Support or Expert Labs for guidance before initiating the upgrade.
UPGRADE / DOWNGRADE TIMINGS
➤ Upgrade Timings for Small & Large Clusters
You must be on SevOne NMS 7.0.1 or above to upgrade to SevOne NMS 7.2.0.
Example# 1: SevOne NMS 7.0.1 or above to SevOne NMS 7.2.0 Upgrade on a small cluster
Example# 2: SevOne NMS 7.0.1 or above to SevOne NMS 7.2.0 Upgrade on a large cluster
Example# 1: SevOne NMS 7.0.1 or above to SevOne NMS 7.2.0 Upgrade on a small cluster
- Cluster Setup
- Cluster consists of 4 x vPAS 20Ks, no DNCs, no HSAs
- Cluster is monitoring 800 devices, 79,200 objects, and 548,800 indicators
- Backfilled with 3 months of data
- SDB export configured
- Timings
- Upgrade takes ~30 minutes
Total Time of Upgrade Time Taken Instant Graph Downtime 5 minutes Device Manager Availability 5 minutes Collection Outage (SNMP / ICMP) - Data Loss 5 minutes Alerting Outage 5 minutes Trap Generation 5 minutes SDB Publishing Outage 5 minutes Reboot Cluster 3-5 minutes - Polling outage is ~2-5 minutes
- Upgrade takes ~30 minutes
Example# 2: SevOne NMS 7.0.1 or above to SevOne NMS 7.2.0 Upgrade on a large cluster
- Cluster Setup
- Cluster consists of 20 x (PAS 200Ks, DNCs, HSAs)
- Cluster is monitoring 800 devices, 79,200 objects, and 548,800 indicators
- Backfilled with 3 months of data
- SDB export configured
- Timings
- Upgrade takes ~1 hours 45 minutes
Total Time of Upgrade Time Taken Instant Graph Downtime 3-5 minutes Device Manager Availability 3-5 minutes Collection Outage (SNMP / ICMP) - Data Loss 0 seconds Alerting Outage 3-5 minutes Trap Generation Undetected SDB Publishing Outage n/a Reboot Cluster 8-10 minutes - Polling outage is ~2-5 minutes
- Upgrade takes ~1 hours 45 minutes
➤ Downgrade Timings for Small & Large Clusters
When downgrading from SevOne NMS 7.2.0, you can only downgrade to SevOne NMS 7.1.0.
Example# 1: SevOne NMS 7.2.0 to SevOne NMS 7.1.0 Downgrade on a small cluster
Example# 2: SevOne NMS 7.2.0 to SevOne NMS 7.1.0 Downgrade on a large cluster
Example# 1: SevOne NMS 7.2.0 to SevOne NMS 7.1.0 Downgrade on a small cluster
- Cluster Setup
- Cluster consists of 4 x vPAS 20Ks, no DNCs, no HSAs
- Cluster is monitoring 800 devices, 79,200 objects, and 548,800 indicators
- Backfilled with 3 months of data
- SDB export configured
- Timings
- Downgrade takes ~44 minutes
- System is unavailable for ~6 minutes for the pods to restart
Example# 2: SevOne NMS 7.2.0 to SevOne NMS 7.1.0 Downgrade on a large cluster
- Cluster Setup
- Cluster consists of 20 x (PAS 200Ks, DNCs, HSAs)
- Cluster is monitoring 800 devices, 79,200 objects, and 548,800 indicators
- Backfilled with 3 months of data
- SDB export configured
- Timings
- Downgrade takes ~1 hour 30 minutes
- System is unavailable for ~6 minutes for the pods to restart
UPGRADE PATH
To proceed with the upgrade, you must be on version SevOne NMS 7.0.1+.
You are now on version SevOne NMS 7.2.0.
Note: SevOne NMS 7.0.1+ and the other components in-use can now be upgraded to end
version 7.2.0.
Important: SD-WAN Fortinet, SD-WAN VeloCloud (VMWare), SDN, and
Wi-Fi are automatically upgraded when SevOne NMS is upgraded to 7.2.0.
Order of Upgrade | Start Version | End Version |
---|---|---|
1. | SD-WAN (Versa / Viptela) 7.0.x | SD-WAN (Versa / Viptela) 7.2.0 |
2. | Data Insight 7.0.x | Data Insight 7.2.0 |
3. | NMS 7.0.1+ | NMS 7.2.0 |
You are now on version SevOne NMS 7.2.0.