After a simulation runs, the Results column displays a drop-down
list that contains the dates when the simulation was generated. Simulation results are retained for
30 days. Results display in the Results column only after a simulation
runs.
About this task
Simulation results provide information on each step of the simulation. For example, the first
step of a simulation provides a list of the directly connected assets that are affected by the
simulation. The second step lists assets in your network that can communicate to first-level assets
in your simulation.
Procedure
- Click the Risks tab.
- From the navigation menu, select .
- In the Results column, select the date and time of the simulation
you want to view by using the list.
- Click View Result. You can view the
simulation result information, starting at step 1 of the simulation.
The following information is provided:
Table 1. Viewing simulation result information
Parameter |
Description |
Simulation Definition |
The description of the simulation. |
Using Model |
The name of the model against which the simulation
was run. |
Simulation Result |
The date on which the simulation was run. |
Step Results |
The number of steps for the result that includes
the step that is being displayed. |
Assets Compromised |
The total number of assets that are compromised in this step and across
all simulation steps.
If the topology model includes data from an IP range of /32 defined as
reachable, then IBM
QRadar Risk Manager does not
validate those assets against the database. Therefore, those assets are not considered in the Asset
Compromised total. QRadar Risk Manager validates
assets only in broader IP ranges, such as /24 to determine which assets exist.
|
Risk Score |
Risk score is a calculated value based on the
number of results, steps, the number of compromised assets, and the importance factor that is
assigned to the simulation. This value indicates the severity level that is associated with the
simulation for the displayed step. |
Move your mouse pointer over the connection to highlight the path through the network, as defined
by the subnet.
The 10 most important assets display when you move your mouse over the connection.
You can move your mouse pointer over a connection to determine the list of assets that are
affected by this simulation.
-
View the Results for this Step table to determine the assets that are affected.
Table 2. Viewing results for this step information
Parameter |
Description |
Approve |
Used for approving simulation results. See Approving simulation results. |
Parent |
The originating IP address for the displayed step
of the simulation. |
IP |
The IP address of the affected asset. |
Network |
The network of the target IP addresses, as defined
in the network hierarchy. |
Asset Name |
The name of the affected asset, as defined by the
asset profile. |
Asset Weight |
The weight of the affected asset, as defined in the
asset profile. |
- To view the next step of the simulation results, click
Next Step.