Procedures performed on a PCI adapter in an IBM® i partition that is powered on, also known as hot-plug procedures, require the system administrator to take the PCI adapter offline prior to performing the operation. Before taking an adapter offline, the devices attached to the adapter must be taken offline as well. This action prevents a service representative or user from causing an unexpected outage for system users.
To remove and replace an adapter, do the following steps:












The device is now configured. This ends this procedure.