Find instructions for installing the Virtual I/O Server and client logical partitions by deploying
a system plan or manually creating the logical partition and logical
partition profiles and installing the Virtual I/O Server and client operating systems.
These instructions apply to installing the Virtual I/O Server and client logical partitions on a system that
is managed by a Hardware Management Console (HMC). If you plan to install
the Virtual I/O Server on
a system that is not managed by an HMC, then you need to install
the Integrated Virtualization Manager. For instructions, see Installing the Integrated
Virtualization Manager.
The installation procedures vary depending on the following factors:
- The version of HMC attached
to the managed system on which you plan to install the Virtual I/O Server and client logical partitions. HMC version 7 displays
a different interface than prior versions of the HMC. HMC version 7 also provides
the ability to deploy a system plan that includes the Virtual I/O Server and client logical partitions.
- Whether you plan to deploy a system plan that
includes the Virtual I/O Server and
client logical partitions. When you deploy a system plan, the HMC automatically performs
the following tasks based on the information provided in the system
plan:
- Creates the Virtual I/O Server logical
partition and logical partition profile.
- Installs the Virtual I/O Server and
provisions virtual resources.
- Creates the client logical partitions and logical partition profiles.
- Installs the AIX® and Linux operating systems
on client logical partitions. The HMC must be at V7R3.3.0,
or later.