You might need to install the system into the rack. Use
the procedure in this section to perform this task. This section also
includes illustrations of the related hardware components and shows
how these components relate to each other.
To install the system into a rack, complete the following
steps:
- If you are installing a 5790 or 7311-D11 expansion unit
into the rack, slide the unit in from the back of the shell.
If you are installing a 5796 or 7314-G30 expansion unit into
the rack, slide the unit in from the front of the shell.
Important: If installing the 7314-G30 or 5796 first
remove the front and back shipping covers. These shipping covers are
secured by four thumb screws each. Two screws are located on the top
of the cover and two are located on the sides of the cover.
Figure 1. Removing the shipping covers
- If you are installing a 5790 drawer (D) into
an existing shell (C), remove the two filler
plate screws (A) and the filler plate (B).
Note: Your shell may have one or two filler plates.
If there is a filler plate where you want to install your drawer,
you need to remove the filler plate.
| A |
Filler plate screws |
| B |
Filler plate |
| C |
Shell |
| D |
Drawer |
| E |
Drawer screws |
Figure 2. Installing the 5790 drawer
- If you are installing a 5790, slide the drawer (D) into
the shell, as shown in Figure 2.
- If you are installing a 5790, install and tighten the two
drawer screws (E), securing the drawer to the
shell as shown in Figure 2.
- If you are installing a 5796 drawer (H) into
an existing shell (G), remove the filler plate (F) by
pressing down the tops tabs and pulling it out.
Note: Your shell may have one or two filler plates. If there
is a filler plate where you want to install your drawer, you need
to remove the filler plate.
| F |
Filler plate |
| G |
Shell |
| H |
Drawer |
| I |
Thumb screw |
| J |
Cable retention bracket |
Figure 3. Installing the 5796 drawer
- Carefully move any existing cables that are blocking the
drawer location.
- If you are installing a 5796, slide the drawer (H) into
the shell, as shown in Figure 3.
- If you are installing a 5796, use a thumb screw (I) to
install the cable retention bracket (J).
- If you are installing two drawers, repeat the steps to
install the second drawer. If there is only one drawer installed in
the shell, ensure that the filler plate is installed
in the blank slot.
- To install the filler plate (K) beside
a 5790, place the filler plate into the blank slot in the shell (M).
Fasten the filler plate with two filler plate screws (L).
| K |
Filler plate |
| L |
Filler plate screws |
| M |
Shell |
To install the filler plate (N) beside
a 5796 in the blank slot in the shell, slide the filler plate up under
the top tab and gently push the filler plate into place.
- Attach the front cover. See Installing
the front cover on a 7311-D11, 5791,
or 5794 expansion
unit or Installing
the front cover on the 7314-G30 or 5796.