It is possible to perform some of the tasks in this procedure
by using a method other than that which is described. If you have
other methods for cabling the
InfiniBand network,
you still must review a few key points in the installation process
regarding order and coordination of tasks and configuration settings
that are required in a cluster environment.
Note: IBM® is responsible for replacing
faulty or damaged cables that have IBM part
numbers.
To cable your switch network, complete the following
steps:
Note: The switch cabling encompasses major tasks
C1 and
C4,
which are shown in
Figure 1.