Use this procedure to unpack and position your rack.
To unpack and position the rack, do the following:
Note: Before
attempting to position the rack, see Moving the system to the
installation site.
- Remove all packing and tape from the rack.
- Place the last floor covering exactly adjacent and in the front
of the final installation location.
- Position the rack according to the customer floor plan.
- Lock each caster wheel by tightening the thumbscrew on the caster.
Figure 1. Caster thumbscrew
- While moving the system to its final installed location and during
relocation, it might be necessary to lay down floor covering, such
as Lexan sheets, to prevent floor panel damage.