Use this procedure to unpack and position your rack.
To unpack and position the rack, do the following steps:
Note: Before
attempting to position the rack, see Moving the system to the installation
site.
- Remove all packing and tape from the rack.
- Place the last floor covering exactly adjacent and in the front of the
final installation location.
- Position the rack according your floor plan.
- Lock each caster wheel by tightening the thumbscrew on the caster.
Figure 1. Caster thumbscrew
- While moving the system to its final installed location and during relocation,
it might be necessary to lay down floor covering, such as Lexan sheets, to
prevent floor panel damage.