Assignment of cost factor groups
To provide maximum flexibility and minimize maintenance, a hierarchy approach is provided for assigning and retrieving cost factors.
Level 0: Enterprise Level
Level 1: Supplier Level
Level 2: Item Level – For physical kit parent items in WIP processing ONLY
At each level an organization can assign a series of Cost Factors to different transactions and assign a value to each cost factor.