Set a sync time

A Change Project is published on the production environment when a synchronization time is set, which is defined by the enterprise.

To set a synchronization time, perform the following steps:
  1. From the tree in the application rules side panel, select Change Project Management ->Change Project Rules
  2. The Change Project Rules screen is displayed.
  3. Enter a time (HH:MM format) in the Change Project is Available For Synchronization At text box.
  4. Click save.