Completing the configuration

After you configure OMEGAMON for Messaging on z/OS using your preferred configuration method (either PARMGEN or Configuration Manager), you must complete several post-configuration steps. These are a combination of required steps and optional steps that depend on your configuration and monitoring objectives.

Table 1. Post-configuration steps
Step Context
Copying the started task procedures to your procedure library Required for all configurations
Copying the VTAM definitions to your VTAMLST system Required for all configurations
Varying the VTAM major node active Required for all configurations
Granting APF authorization for the runtime load libraries Required for all configurations
Granting authorities to IBM MQ Monitoring Agent Required for the IBM MQ Monitoring Agent
Authorizing IBM Integration Bus Monitoring Agent Required for the IBM Integration Bus Monitoring Agent
Setting IBM Integration Bus Monitoring Agent parameters Required for the IBM Integration Bus Monitoring Agent
Authorizing users to access product managed systems on the enhanced 3270 user interface Required for the OMEGAMON enhanced 3270 user interface
Authorizing users to issue agent predefined Take Action commands on the enhanced 3270 user interface Required for the OMEGAMON enhanced 3270 user interface
Customizing the enhanced 3270 user interface Required for the OMEGAMON enhanced 3270 user interface
Verifying the configuration Required for all configurations
Installing application and language support Required for all configurations
Monitoring IBM App Connect Enterprise on zCX Required for monitoring IBM App Connect Enterprise on zCX