Example of a rule-of-thumb definition
This example shows how to define your rule of thumb on the Definition page of the Rule-of-Thumb Properties window.
Assume the following:
You want to analyze specific data of the Buffer Pool Read report
block of the DB2PM_STAT_BUFFER table. If the result
of dividing the value in the NO_PREFETCH_NO_BUF column
by the value in the SEQ_PREFETCH_REQ column is greater
than 0.01, you want to get a warning. If the result
exceeds 0.05, you want to be informed that a problem
exists. In both cases, you want to give the recommendation that the
EDM pool must be increased. In addition, you want the analysis result
to include the value of the SEQ_PREFETCH_REQ column.
- In the Report block list, click
BUFFER POOL READ. - In the Columns box, click
NO_PREFETCH_NO_BUFand then click Add (
) next to the VALUE
expression box. The selected column is added to the VALUE expression box, preceded by the table name.
- In the Columns box, click
SEQ_PREFETCH_REQand then click Add (
) next to the VALUE
expression box. The selected column is added to the VALUE expression box, preceded by the table name. Performance Expert leaves a space between this and the previously added column.
- In the VALUE expression box, type the operator
/between the two columns to specify the division. - In the Columns box, click
SEQ_PREFETCH_REQand then click Add (
) next to the Additional
columns box. - In the VALUE list (under WARNING and PROBLEM thresholds), click the operator > because you want to be notified when the result of the previously selected columns exceeds a certain value.
- In the WARNING threshold field, type
0.01. - In the PROBLEM threshold field, type
0.05. - In both Recommendation fields, type
Increase BP size as needed.