Db2 Subsystem windows
Use the DB2® Subsystems List window to select the Db2 subsystem to be monitored.
Only the Db2 subsystems with data collectors started within the MVS system are listed on the Db2 Subsystems List window.
To display this window, select Option 1 (DB2 Subsystem) from the Options menu.
DGOMDWSL DB2 Subsystems List ROW 1 TO 3 OF 3
Select the Data Collector to use or specify a DB2 subsystem ID
DB2 Subsystem DSN1
Data Collector DB2 Location DB2 Release
_ DSNB PMO1DB11 V10
_ DSNC PMO1DC11 V10
************************** BOTTOM OF DATA ***************************
Command ===> ____________________________________ Scroll ===> CSR
F1=Help F2=Split F7=Up F8=Down F9=Swap F12=Cancel
F16=Look F17=Collect
The following columns are shown:
- Data Collector
- The data collector identifier.
- Db2 Location
- The location as obtained from the trace records for the data collector.
- Db2 Release
- The Db2 release level.
To monitor a Db2 subsystem that has an active data collector running, enter any character in the input field beside a data collector Db2 location and press Enter.
To monitor a Db2 subsystem that does not have an active data collector running, enter the name of the Db2 subsystem in the DB2 Subsystem field and press Enter.
If no data collectors are active on your MVS system, the Db2 Subsystem window is displayed instead.
DGOMDWS1 DB2 Subsystem
Enter the subsystem ID of the DB2 subsystem to monitor and
press Enter.
DB2 Subsystem ____
F1=Help F2=Split F9=Swap F12=Cancel
- Viewing past data
- Periodic exception processing while you are not logged on
- Exception event processing
- Collection of parallel tasks for query CP parallelism
Changing Db2 subsystems terminates all asynchronous tasks that were started using the Online Monitor. If you change Db2 subsystems while an asynchronous task is active, you are notified by the Asynchronous Task Termination panel.
If you work in split screen mode and you change the subsystem in one session, asynchronous tasks are terminated even if they were activated in the other session.
DGOMGP03 Asynchronous Task Termination
Press Enter to change Subsystem or request Cancel to restore the
Subsystem ID to its previous value.
Changing the Subsystem results in the termination of all active
tasks as well as the stopping of all the DB2 traces started by the
Collect Report Data facility.
Exception/Collect tasks Status
---------------------------------------------- ---------------------------
Periodic Exception Active
Exception Event Not active
Collect data for acct/io/stats/audit Active
CICS problem Active
Collect Task C Not active
Collect Task D Not active
Command ===> _____________________________________________________________
F1=Help F2=Split F3=Exit F9=Swap F12=Cancel F16=Look
F17=Collect
To change Db2 subsystems, press Enter. All asynchronous tasks are terminated.
To return to the previous panel without changing Db2 subsystems, press F3 (Exit) or F12 (Cancel). All active asynchronous tasks remain active.