Scheduled backups
Deployment options: Netezza Performance Server for Cloud Pak for Data System
This section provides the steps necessary to create and configure backup groups that are needed
to schedule backups. The NetWorker server runs the nzbackup command automatically
after it creates the following objects:
- At least one backup group
- At least one backup command file
- A schedule
A separate command file and associated backup group is required for each scheduled backup operation. The data from the backup operations that are run by using one specific command file form a backup group. For example, if you have two databases, DBX and DBY, and you want to schedule weekly full backups plus nightly differential backups for each, you must create four command files, one for each of four backup groups.