Configuring GADS

Configure GADS metadata for your wind farms by downloading configuration sheets, completing the required information, and uploading them to the system.

About this task

GADS configuration requires you to define plant settings, subgroup configurations, and turbine-to-subgroup mappings that use configuration sheets that follow NERC guidelines.

Procedure

  1. From the GADS portal, log in with your credentials.
  2. Go to the GADS configuration page.
  3. Select the GADS-enabled farm that you want to configure.
  4. Download the following configuration sheets:
    • Onboarding sheet
    • Plant config
    • Subgroup config
    • Turbine versus subgroup mapping (from NERC guidelines)
  5. Complete the details in each sheet based on the provided guidelines.
  6. Return to the configuration page and upload the completed sheets.
    The system does basic validation on the uploaded sheets.
  7. Review the validation results and confirm the upload to finalize the metadata for GADS compliance.