Scheduling asset analytic processes

Asset analytic processes can be scheduled to run automatically from a Job Scheduler.

About this task

For efficiency, run asset analytic processes in the same job schedule ETL that loads the energy data into the fact tables.

The asset analytic processes run only if the ETL inserts new energy records and the log of the job schedule completes without error, which is indicated by a status other than Failed.

There is no value of running the rules more often than the fact tables refresh because that would be running the rules against the same data.

Procedure

  1. Go To Tools > System Setup > Job Scheduling > Job Scheduler and find the Job Scheduler that loads the energy data you want to analyze into the fact tables.
  2. To run the analytic process as part of the Job Scheduler, select Run Analytic Processes in the Schedule section.
    The Analytic Processes sub tab is displayed.
  3. In the Analytic Processes sub tab, click Find and add all the analytic processes that you want to run.
    All analytic processes with status of ‘Active’ or ‘Completed’ can be associated to the Job Scheduler.

Results

Once the Job Scheduler is activated, the asset analytic processes run automatically after the Job Schedule's ETL completes successfully and inserts records. You can view all Job Schedulers that are configured to include Analytic Processes at Sustainability > Set Up > Analytics > Process Job Schedules.