Percent RFI Overdue metric
Identifies projects that contain a large percentage of overdue RFIs, then drill in to that project and act on those RFIs that are identified as the most overdue.
Details of the metric | Description |
---|---|
Name | Percent RFI Overdue |
Category | Operational |
Analysis objective for exception conditions | Identifies the projects with a higher number of overdue RFIs than normal require attention. |
Description | Helps project managers identify projects that need attention by showing which projects have the most RFIs overdue and by showing at the project level which RFIs are the most overdue. |
Source | Customer Focus Group |
Measurement | Total RFIs Overdue / Total RFIs |
Dependent data that is calculated | RFI overdue = RFI Required By date < System Date |
Roles | PR Manager |
Display chart types | Value-based: Horizontal Grouped Bar (percent) Chart |
Thresholds |
|
Fact details | Module: triMetricFact Business Object: triRFIFact Metric Queries: triRFIFact – Metric – Percent RFI Overdue |
Drill paths |
|
Interactive filters |
|
Static filters |
|
Time | Months |
Data point refresh rate | Monthly |