Percent RFI overdue metric

Identifies projects that contain a high percentage of overdue RFIs, then drill in to that project and act on those RFIs that are identified as the most overdue.

Name
Percent RFI Overdue
Category
Operational
Analysis objective for exception conditions
Identifies the projects with a higher number of overdue RFIs than normal require attention.
Description
Helps project managers identify projects that need attention by showing which projects have the most RFIs overdue and by showing at the project level which RFIs are the most overdue.
Source
Customer Focus Group
Measurement
Total RFIs Overdue / Total RFIs
Dependent data that is calculated
RFI overdue = RFI Required By date < System Date
Roles
PR Manager
Display chart types
Value-based: Horizontal Grouped Bar (percent) Chart
Thresholds
  • Low Threshold: .1 (10%)
  • High Threshold: Not Used
  • Range 1: Good/Positive/Green
  • Range 2: Poor/Negative/Red
  • Range 3: Not Used
Fact details
Module: triMetricFactBusiness Object: triRFIFact

Metric Queries: triRFIFact – Metric – Percent RFI Overdue

Drill paths
  • Program
  • Project Classification
  • Project
  • Project Manager
  • Capture Period
Interactive filters
  • Geography
  • Organization
Static filters
  • Active Project
  • Active RFIs
Time
Months
Data point refresh rate
Monthly