Churn (disruption costs)

The Churn (Disruption Costs) scenario metric calculates the churn for the scenario by using the setup data and move item data as the source of the calculation.

Name
Churn (Disruption Costs)
Metric category
Operational
Metric objective
Calculate the churn for the scenario by using setup data and move item data as the source of the calculation
Measurement
Move Downtime Estimated Cost * People Moved

Move Downtime Estimated Cost = From Tools > System Setup > General > Application Settings > Planning Settings tab > Details section.

People Moved = The sum of the Quantity field from the associated Move Items where the Move Type = Person.

Default thresholds
Low Threshold: 0

High Threshold: 99999999

Range 1: Good/Positive/Green

Range 2: Marginal/Caution/Yellow

Range 3: Poor/Negative/Red

Default target
.00 US Dollars