Churn (disruption costs)
The Churn (Disruption Costs) scenario metric calculates the churn for the scenario by using the setup data and move item data as the source of the calculation.
- Name
- Churn (Disruption Costs)
- Metric category
- Operational
- Metric objective
- Calculate the churn for the scenario by using setup data and move item data as the source of the calculation
- Measurement
- Move Downtime Estimated Cost * People
Moved
Move Downtime Estimated Cost = From Tools > System Setup > General > Application Settings > Planning Settings tab > Details section.
People Moved = The sum of the Quantity field from the associated Move Items where the Move Type = Person.
- Default thresholds
- Low Threshold: 0
High Threshold: 99999999
Range 1: Good/Positive/Green
Range 2: Marginal/Caution/Yellow
Range 3: Poor/Negative/Red
- Default target
- .00 US Dollars