Churn (Disruption Costs)
The Churn (Disruption Costs) scenario metric calculates the churn for the scenario by using the setup data and move item data as the source of the calculation.
Item | Description |
---|---|
Name | Churn (Disruption Costs) |
Metric category | Operational |
Metric objective | Calculate the churn for the scenario by using setup data and move item data as the source of the calculation |
Measurement | Move Downtime Estimated Cost * People Moved Move Downtime Estimated Cost = From Tools > System Setup > General > Application Settings > Planning Settings tab > Details section. People Moved = The sum of the Quantity field from the associated Move Items where the Move Type = Person. |
Default thresholds | Low Threshold: 0 High Threshold: 99999999 Range 1: Good/Positive/Green Range 2: Marginal/Caution/Yellow Range 3: Poor/Negative/Red |
Default target | .00 US Dollars |