Integrating the building with Maximo Real Estate and Facilities
Integratie a building with IBM® Maximo® Real Estate and Facilities.
Procedure
- Select how you wish to integrate the building. The options for integrating the building are provided in the section Building. The behavior of the rest of the form varies slightly based on the option selected.
- Select a location. The location list can be filtered if desired. Land is displayed in the list for information, but is disabled as it is not a valid parent for a building.
- If Add Linked Model, Existing Building or, Reattach is selected, the building list is populated with buildings available for the location. The list is retrieved from the Maximo Real Estate and Facilities server when the location is selected, so large lists may take a moment to load. For Existing Building, all buildings for the location that are not linked to a model are displayed. For Add Linked Model and Reattach, only buildings that were previously linked to a model through one of the other three options are displayed. Double click a building to display a form that allows you to view and edit a subset of the building fields.
- If New Building is selected, you can specify currency and units of measure.
Managing the location hierarchy
Before you begin
About this task
Procedure
Staging Records
Integrating a Building creates triBIMBuilding and triBIMModel staging records. Reattaching to a previously integrated building reads these records, but makes no changes.