You can define the lead time for preventive maintenance
(PM) alert messages so that alerts display before work orders are
generated.
Procedure
- In the Preventive Maintenance application, display the
PM record that you want to define alert lead time for.
- Click the Frequency tab.
- For time-based PMs, on the Time Based Frequency subtab,
specify the alert lead time (in days) in the Alert Lead
(Days) field.
- For meter-based PMs, click the Meter Based Frequency subtab,
then click the Detail Menu to display the meter information. If no
meter was previously defined, define one now by clicking New
Row. Specify the alert lead (in meter frequency units)
in the Alert Lead field.
- Click Save PM.