Specify frequency for a meter-based master preventive maintenance
(PM) record to determine how often its associated PMs generate work
orders.
About this task
For meter-based PMs, the generation criteria is based on
metered equipment usage since the target start date or completion
date of previous work.
Procedure
- In the Master PM application, display the master PM you
want to define frequency for.
- Click the Frequency tab.
- Select one of the following options to specify whether
you want associated PMs to be on a fixed or floating schedule:
- To use a fixed schedule, select the Use Last Work
Order's Start Date to Calculate Next Due Date check box.
- To use a floating schedule, clear the Use Last
Work Order's Start Date to Calculate Next Due Date check
box.
- On the Meter Based Frequency subtab,
click New Row.
- In the Meter field, specify a value
based on how much metered activity you want to occur between PM work
orders for this asset.
You can only select continuous-type
meters.
- Optional: In the Frequency and First
Start Reading fields, specify values.
The value
in the First Start Reading field is the first
meter reading at which the associated PMs generate work orders.
- Optional: Enter multiple meter frequency criteria
by repeating steps 4 through 6.
- Optional: Update meter-based frequency information
about the associated PMs by selecting the Update Meter
Based Information in Existing PMs check box. When you
update associated PMs, the meter-based information is copied to the
associated PM records.
- Save the record.