Generating work orders to address specific problems

When the meter reading of an asset or a location is outside of specified limits, you can generate work orders to address the problem.

Procedure

  1. From the List tab of the Condition Monitoring application, select the records for which you want to generate work orders.
  2. Select the Generate Work Orders action.
  3. In the Effective Date field, specify the effective date. You can modify this field until you generate the work orders.
  4. Optional: In the Memo field, type a short description of the work orders. This field is used only in the Condition Monitoring application. The description is not copied to the Description field of a work order.
  5. Optional: If you want to use the action limits of the measurement point as the criteria for generating work orders for an asset, select the Use Action Limits as Work Order Generation Criteria box. When you use the action limits as criteria, you can generate work orders only when meter readings are outside the upper limits or outside the lower action limits.
  6. Click OK.