Upgrade prerequisites

Check your Maximo® Asset Management version and get your environment ready for upgrading by configuring your Red Hat® OpenShift® cluster.

Product version

Before you upgrade to Maximo Manage, you must have Maximo Asset Management 7.6.0.10 or 7.6.1.2 or later installed.
Note: For IBM® Control Desk, ensure that you have IBM Control Desk 7.6.1.5 and Maximo Asset Management 7.6.1.3 installed, to upgrade to Maximo Manage and Maximo IT.

Red Hat OpenShift cluster requirements

Prepare the Red Hat OpenShift cluster based on the following requirements:
  1. Determine the capacity needed to upgrade the product.

    For more information, see Planning.

  2. Secure a Red Hat OpenShift cluster for development, testing, or production.

You must ensure that the prerequisites to install Maximo Application Suite are in place.