Validating restoration of Maximo Manage

To verify that the restore was successful, check the status of the Maximo® Manage workspace CR in the Red Hat® OpenShift® console.

Procedure

  1. Verify the success of the following processes.
    • The build was completed.
    • The Maxinst command was completed.
    • The server bundles were deployed.
  2. Log in to Maximo Manage.