Setting preventive maintenance counters
If you have the appropriate access, you can reset the preventive maintenance (PM) counter. You might reset the PM counter if you want the PM to use a different job plan than the one that is scheduled to be next.
Procedure
Example: Preventive maintenance counters for a turbine
You
have the following job plan sequence on a PM. The Counter value
is 3. The next work order generated from the PM uses the job plan
associated with sequence 4. You decide to repeat job plan sequence
1 rather than run job sequence 4, so you change the Counter value
to 2. The job plan with sequence 1 is implemented next and job sequence
4 is postponed:
Job Plan | Description | Sequence |
---|---|---|
INS-TURB | Inspect turbine | 1 |
INS-TURBCOMP | Inspect turbine components | 4 |
INS-TURBFEED | Inspect turbine and feeder system | 12 |