Available from 9.2.7.
When the assignment of a component to the
product is correct, you can confirm it. The task is optional. However, components whose assignment
is not confirmed can be automatically reassigned to different products. It might happen when a new
software catalog is uploaded during the upgrade of the License Metric Tool server or when a different product is suggested as
the best bundling option based on the new results of automated bundling. To avoid such a situation,
it is recommended to confirm the assignment of all components.
Before you begin
You must have the Manage Software Classification permission to view the Software
Classification panel and classify software. To view some additional columns related to computers on
which the components are installed, you also need the View Endpoints permission.
Procedure
-
In the top navigation bar, click .
-
Confirm all components that are marked as One to One.
If a component relates to a single product in the software catalog, the relation is marked as
One to One. Previously, all IBM components that had a single bundling option in the software catalog
were automatically confirmed. Now, you can easily filter the report to review these components, and
confirm them. It ensures that you are fully in charge of the software classification process.
-
Hover over Configure, and click Configure View.
Then, add the following filters to the filters that are already defined in this report, and click
Submit.
IBM-provided Bundling Option
, equal to
,
Yes
One to One
, equal to
, Yes
Confirmed
, equal to
, No
-
Press
CTRL
+ A
, or CMD
+ A
on Mac, to select all the filtered components.
-
Hover over Confirm, and click Confirm.
-
Confirm all assignments that are correct.
-
Select a component or components that you want to confirm.
-
Hover over Confirm, and click Confirm.