Installing and configuring IBM InfoSphere Optim Workload Replay

To install InfoSphere® Optim™ Workload Replay, first prepare for the installation by familiarizing yourself with the roadmap, verify that your computers meet the installation requirements, and obtain the installation images. Then install and configure InfoSphere Optim Workload Replay on a dedicated server, and IBM® InfoSphere Guardium® S-TAP® on each database server that you will use for capturing or replaying workloads.