Installation overview
Perform the following high-level tasks to install, deploy, and start Z APM Connect DG.
Procedure
- Create a project or namespace, and create necessary secrets for TLS and connectivity to
Instana. For detailed instructions, see Pre-deployment configuration.
- Extract the tar file by using the
tar -xf 25.2.0-INSTANA-.tar.gz
command and load the images to cluster's image registry.For detailed instructions, see zapm_dg_delpoy_manual.html. - Populate the deployment files. For detailed instructions, see Populating deployment files.
- Apply the deployment to start the Z APM Connect DG. For detailed instructions, see zapm_dg_openshift_start.html.