Installation overview

Perform the following high-level tasks to install, deploy, and start Z APM Connect DG.

Procedure

  1. Create a project or namespace, and create necessary secrets for TLS and connectivity to Instana.
    For detailed instructions, see Pre-deployment configuration.
  2. Extract the tar file by using the tar -xf 25.2.0-INSTANA-.tar.gz command and load the images to cluster's image registry.
    For detailed instructions, see zapm_dg_delpoy_manual.html.
  3. Populate the deployment files.
    For detailed instructions, see Populating deployment files.
  4. Apply the deployment to start the Z APM Connect DG.
    For detailed instructions, see zapm_dg_openshift_start.html.