DFS0226A CTL REGION WAITING FOR CQS (name) RESPONSE TO CONNECT REQUEST - imsid
Explanation
This message indicates that the IMS control region has issued the CQS CONNECT request and is waiting for a response from CQS.
- That are not XRF capable
- During IMS restart for XRF active systems
- During XRF takeover for XRF alternate systems.
If the CQS region is stopped after IMS connects to CQS, IMS must reconnect to CQS after the CQS region becomes available again. This message is also issued during reconnect processing.
- name
- The name specified by the CQS= parameter. This can be either the name of the SYS1.PROCLIB member containing the CQS region JCL, or the name of the member containing the z/OS® START command used to start the CQS procedure.
- imsid
- The IMS identifier.
System action
The control region waits for the CQS region to respond to the CONNECT request. The CQS region cannot complete the CONNECT request until CQS completes initialization and issues the CQS READY message, CQS0020.
Operator response
If CQS is initializing, no action is required. CQS will complete CONNECT processing. If CQS issued a WTOR as part of CQS initialization, respond to the WTOR to allow CQS initialization to complete. If the CQS address space fails before it responds to the CONNECT request, the IMS control region is notified and no action is necessary.
Module
DFSSQ020