How system definition is related to installation
System definition and JCL preparation are only a part of the total installation process. You should understand the relationship between installation and system definition before defining your system.
Related reading: For step-by-step instructions on installing an IMS system, see IMS Version 15.3 Installation.
A full installation process includes:
- Building IMS system libraries
- Allocating and cataloging IMS data sets
- Defining the IMS system
- Preparing the operating system for IMS,
including:
- VTAM®
- RACF®
- APPC/MVS™
- Installing IMS exit routines
- Tailoring IMS buffers and certain performance options
- Defining terminals (VTAM and non-VTAM)
- Updating MFS device characteristics table and MFS default formats
- Defining LU 6.2 descriptors
- Defining ETO descriptors
- Building IMS.DBDLIB
- Building IMS.PSBLIB
- Building IMS.ACBLIB
- Preparing for dynamic allocation of databases and related system data sets
- Compiling message format descriptions
- Loading application programs
- Initial loading of databases
- Establishing IMS security
- Initializing IMS.MODSTAT
- Copying staging libraries to active libraries