DFS2672A (LOG|CHNG) REQUEST FAILED: AREA xxxxxxxx, UOW nnnnnnn
Explanation
The DEDB Direct Reorganization utility, DBFUMDR0, was unable to satisfy the indicated internal request.
In the
message text:
- xxxxxxxx
- The area name
- nnnnnnn
- The number of the affected unit of work
The LOG request is made at the
end of the build phase to log the copy phase reached
indicator.
The CHNG request is made at the end of the copy phase to reset the copy
phase
indicator.
System action
The utility terminates with a return code of 24. The database is not usable.
Programmer response
Restart the utility must at the failing unit of work.