DFS0727A DATE/TIME SPECIFIED NOT WITHIN 12 DAYS OF DATE PI TRACE STARTED
Explanation
One of the following problems occurred:
- The DATE operand specified a date that was more than 12 days before or after the date PI tracing was started.
- The combination of the START and DATE operands resulted in a start time greater than 12 days from the date PI tracing started.
System action
The program is terminated.
Programmer response
Correct the control statement specifying a valid date or starting time.