Recovering both IMS and Db2 subsystems at the local site
After you have created IMS and Db2® disaster recovery profiles (see Creating IMS and Db2 disaster recovery profiles to perform this step), you must provide a recovery PDS, which is a data set where all jobs and control cards generated by the preparation job will be placed.
Both the IMS and the Db2 subsystem must use the same recovery PDS.
Follow steps 3 and 4 of Preparing for disaster recovery at the local site. IMS Recovery Expert will generate additional JCL and control cards to support an IMS and Db2 coordinated disaster recovery.