Red Brick Load and the Parallel Canvas
Red Brick Load stages can run on the Parallel Canvas. The default for all stages is Sequential. "In Parallel" mean you can set it to run in parallel, but this is not the default. Table 1 provides detailed information.
Connectivity Stage | Available on the Parallel Canvas in Windows | Available on the Parallel Canvas in UNIX | Used as a Source or a Target or for Processing | Runs Sequentially or In Parallel |
---|---|---|---|---|
Red Brick Load | Yes | Target | Sequential |