Example of delta processing
The following example describes how to coordinate delta processing between the Load stage and the Oracle Applications stage.
- Start the processing from the Scheduler (Maintain InfoPackage) dialog in SAP BW. To do this, select Initialize Delta Process as the Update Mode on the Update page.
- Make your selection from the Data Selection page of the Scheduler (Maintain InfoPackage) dialog. Use the JJJJ/MM/DD date format.
- In DataStage®, open the Oracle Applications Direct Access stage and select the Delta tab on the Outputs page to enable delta processing:
- Select a table from the Available delta tables list and move it to the Selected Delta tables list, then specify the appropriate path and filename in the Path to delta file field:
- From the Scheduler menu in SAP BW, select Initialization Options for Source System, then select Start Data Load immediately from the Schedule page:
- Mark and delete the entry on the Initialization for this Source window.
- An informational message appears, verifying the deletion.
- Ensure the delta file is deleted on the server. You can view log information in Notepad.